0mm1000mm2180mm single air shower room manufacturer's Standard Size 120

Generally speaking, the air shower with wind speed more than 20 meters can achieve dust removal effect. If the wind speed is lower than 20 meters, the effect will be greatly reduced. Since we choose to install the air shower room, we need to leave enough space for the air shower room, so it involves the problem of on-site installation. If you can put down the size of the equipment in all directions, you can buy the whole machine directly, but it is not strict Only can be installed on site, after all, the installation also involves the cost of enterprises. About the air shower room, the basic use of 380V electricity can be.

Single air shower room is a kind of special local purification equipment, which is installed at the partition wall between clean room and non clean room. It is used for purging and dedusting when people or objects enter the clean area. After use, the dust source can be effectively lowered into the clean area to keep the clean area in normal working condition.

1. All staff entering the dust-free room should take off watches, accessories and other articles in the clothing room outside, and wear dust-free clothes and shoes.

The single air shower room can be divided into human shower and cargo shower. The primary filter of air shower room: aluminum alloy frame, filter cotton, double-sided wire mesh support, folded or tiled, filtration efficiency: G4 (weight method) / 95% @ 5um, to ensure the purification level, better protect the high-efficiency filter, and prolong the service life of the high-efficiency filter.

Installation steps of air shower chamber: 1. The air shower chassis is usually made of stainless steel plate with a thickness of 40mm. The chassis is composed of no dead angle. First, place the air shower chassis at the position where the air shower is installed. There is no need to fix the chassis with the ground. It can be kept stable by its own weight. About 350kg for single person and 650kg for double. 2、 Place the air shower side box on the chassis for two minutes. Pay attention to the position of the chassis and the side compartment. 3、 After the side and side chambers are fixed, the top box is installed and connected with the side box body. Attention should be paid to the verticality of the upper and lower parts, and continuous measurement should be carried out. The manufacturer's standard size of m single air shower room is 120 to ensure that the sizes of upper and lower parts of the frame are identical. 4、 The frame without dead corner is completed. Then, the door is installed. The door and door frame are developed and produced by stainless steel square tube and stainless steel. The hinge is reinforced by three stainless steel hinges. The original door frame and door panel have been installed before the manufacturer leaves the factory. At this time, it is only necessary to fix the hinge to the side compartment of the wind shower. If the gap between the door frame and the box is not even and there is friction after the door is installed, it is caused by the uneven ground. In this step, it is not necessary to adjust the door frame. It is only necessary to carry out vertical correction on the lower part of the air shower, so that the air shower chassis can be leveled. The four corners can be re adjusted with gasket. If the gasket is flat, the gap between the door body and the box body will be completely neat. 5、 Install the air shower room lamp and electrical appliance. The air shower room electrical appliance is a fast socket, only need to plug the corresponding socket, Rex electric lock, infrared photoelectric, lighting lamp interface to the corresponding interface. 6、 Power on: three phase five wire system, three fire lines, one ground wire and one zero line. In case the wind is very small after the power is connected, most of the fans are reversed. Only one of the three fire lines needs to be interchanged?

How to use air shower room 1 correctly. Attention should be paid to the replacement of high-efficiency equipment. In addition, it is not necessary to carry out correct installation according to the marks on the equipment at the installation time. It is necessary to ensure that the sealing performance is good to prevent leakage. 2。 According to the actual use of the situation, regularly remove the filter equipment, cleaning, maintenance. 0mm1000mm2180m3。 When a series of measures, such as replacement and cleaning, have been used, and if they have not been improved, it is recommended that the high-efficiency air equipment inside the device appears to be blocked, and it will be replaced in time. 4。 Use the machine to regularly measure the technical indicators of the equipment, but any non-conforming phenomenon should be handled in a timely manner. 5。 After installation, it is not necessary to confirm that there is no leakage in the frame of the filter equipment. The dust particle counter is used to detect the leakage of the filter equipment, and then it can be used after reaching the corresponding technical specifications. 6。 If it is found that the wind speed of the equipment becomes smaller, the surface of the primary efficiency air equipment should be checked first for blackening. However, if there is any, it is recommended that the accumulated dust in the filtering equipment has exceeded, which generally increases the operation resistance. During this period, the equipment should be removed for cleaning or replacement.

Plate selection of air shower room (air shower door): 1. High quality A3 cold rolled steel plate, multi-layer pickling and baking paint, the color is white; 2, high-quality 304 stainless steel, 201 stainless steel, 316 stainless steel, stainless steel can be divided into sanding or mirror light; 3, high-quality color steel plate.

Main accessories of single air shower room (air shower door): including shower fan, primary filter, high efficiency filter, main board, sub plate, stainless steel nozzle, door closer, etc. 1. Air shower fan: efficiency and 1. 1kW, power supply 380V / 220V, 50Hz. The fan is the fan of purifying air shower room, with small volume, large air volume, high air pressure, easy installation and other flash points.

Air shower high efficiency filter: paper partition board, glass fiber filter material, aluminum alloy frame or wood frame are used for research and development. The air inlet and outlet surfaces are sealed with sealing strips. The filtration efficiency is H1 (weight method). Better ensure the cleanliness of the clean room.

3. Enter from the entrance direction of the air shower room, stand in the induction zone, turn around 360 degrees, infrared s (set before delivery, time adjustable), intelligent voice prompt.

The materials of air shower room can be divided into: stainless steel, sheet metal paint, color steel plate, external sheet metal paint, internal stainless steel, external color steel plate, internal stainless steel.

Single air shower room is mainly used in electronics, instrumentation, machinery, metallurgy, petroleum, chemical industry, textile, nuclear power plant, food and other industries.

What should be paid attention to when using air shower room! 1。 Do not ignore the door of the air shower room. Regular maintenance is required. Pay attention to whether the electronic lock is aligned with its lock hole. 2。 Regularly check the electrical wires in the air shower room. Attention should be paid to the use of air shower room temperature should not exceed 50 ℃, in addition to this, put an end to open fire.


Last article: Recommend [Jiulong new purification equipment] Lishui stainless steel air shower customized factory

Last article: Fu recovery? Safe and fast recovery air shower f

Recommended products

What's new